Damping was correlated with patience, phase position was correlated with avoidance, indicating that frequency, patience and avoidance were three resistance factors.
通过进一步分析认为阻尼与耐性相关,相位与避性相关,因此可以认为频率、耐性和避性是抗性的三个因素。
The results show that the frequency and phase position of frequency converter output power are out of phase with that of supply power, which is the main reason leading to metering system breakdown.
分析结果认为:变频器输出电源的频率和相位与供电电源频率和相位不同步是造成计量系统产生故障的主要原因。
This negotiating the Contract phase from a "bent over" position, as Block quips, teaches the client that you work in a bent over position!
正像Block讽刺的那样,以“折腰”的姿态来协商合约,客户在此阶段也会知道咨询师确实是处在一个“弯腰”的位置上,从而对咨询师“要挟”。
应用推荐